Colorado Springs · Stamped & flatwork concrete

Concrete worthshowing off.

Stamped patios, driveways, walkways and steps across Colorado Springs and the foothills. Free estimates — and Armando is on the job, not just on the phone.

Se habla español

Free estimate

Tell us about the job

No deposit, no obligation. Armando calls you back to set a time.

Stamped work

Colour, texture, and a pattern you pick

Every photograph is A.D.C Concrete's own work on real Colorado Springs homes. No stock photography anywhere on this site.

A copper-toned ashlar-pattern stamped concrete pad, freshly sealed so the colour reads deep and wet.
Ashlar stamp, copper release, sealed.
A large russet stamped concrete patio being rolled with sealer, the wet half noticeably darker than the dry half.
Sealer going down. The wet edge is the colour it keeps.
View service: Stamped concrete

Before & after

Drag the handle

Three of these were shot from the same spot before and after, so you can wipe between them yourself. Grab the orange handle and pull.

The same walkway finished — a broom-finished concrete path and landing running alongside a brick house.
A front walkway staked out with timber forms and steel reinforcing mesh laid over graded dirt.
BeforeAfter

Front walking path

Forms set, base graded, wire mesh tied — then a broom-finished path and landing that lines up with the existing drive.

The same patio finished — forms stripped, edges tooled, and a clean raised slab edge above the lawn.
A freshly poured back patio, still wet and floated smooth, with timber forms and stakes around the edge.
BeforeAfter

Back patio

Same patio an hour apart: floated flat with the forms still on, then stripped, edged and jointed with a clean raised edge.

The same flight finished — poured concrete steps with even risers running up the slope beside the house.
A flight of steps formed in timber with steel rebar standing up through it, cut into a dirt slope beside a house in the pines.
BeforeAfter

Hillside steps

A run of steps cut into a slope beside the house. Forms and rebar first, then poured and finished tread by tread with the risers kept even the whole way up.

Three more, side by side

A driveway mid-replacement, with steel reinforcing mesh laid across the prepared base and timber forms at the apron.
Before
The finished driveway — a smooth jointed concrete drive running to a carport, edged with brick against gravel.
After

Driveway replacement

The old drive came out, the base was regraded and meshed, and a new jointed drive went in against a fresh brick edge.

A curved side walkway formed and ready to pour, with compacted base between a stone-veneer wall and a river-rock bed.
Before
The same side walkway finished — a smooth curving concrete path sweeping between the house and the river rock.
After

Side walkway

A curved side path between two houses, formed to a radius rather than a straight run so it follows the river-rock bed.

Timber forms for front entry steps and a landing at a new-build house, set between a finished sidewalk and bare dirt.
Before
The same entry finished — poured concrete steps and landing running from the sidewalk up to the front door.
After

New-build front entry

Forms set off the sidewalk for the entry steps and the landing, then poured, tooled and left to match the walk that was already there.

How it goes

Four steps, no mystery

Concrete is unforgiving — you get one pass at it before it sets. Here is the order we work in, so you know what you are looking at when we are in your yard.

  1. We walk it with you

    Armando comes out, looks at the grade, the drainage and what is already there, and tells you what it will cost. That visit is free and there is nothing to sign at the end of it.

  2. Tear-out and base

    Whatever is failing comes out and gets hauled off. Then the base gets dug, graded and compacted — the step nobody sees and the one that decides whether the slab is still flat in ten years.

  3. Pour, float, stamp

    The pour is the loud day. Concrete goes in, gets screeded and floated, then colour and release go down and the stamp mats go on while it is still green. This is the window that cannot be redone.

  4. Cut, wash, seal

    Control joints get cut so the slab cracks on our line instead of its own. For stamped concrete, the release is washed off and we wait at least five days after the pour before applying sealer.

Straight answers

What you get either way

  • The estimate is free

    It is their own standing offer and we mean it literally — a visit, a look, a number. No deposit to get one.

  • Insured

    A.D.C Concrete carries insurance on the work and on the crew.

  • The owner is on the job

    This is a small crew, not a call center that subs your driveway out. Armando is the one who quotes it and the one who is standing there when it is poured.

  • We take the old slab too

    Removal and haul-away is on the service list on purpose. You do not need to solve the demolition before you can call us.

Free estimate

Tell us what you're standing on

A rough idea of the job is enough to start. Armando will call you back to set a time to come look at it.

Free Estimates & Insured